Wave Star Energy

Development of the WaveStar wave energy converter with responsibility for various mechanical tasks. Installation of the 900t C5 prototype in the North Sea, Hanstholm, Denmark, 2009.

  • Design, calculation, implementation and test of a 900t capacity jacking system for offshore installation
  • Design and calculation of various systems such as HVAC
  • Investigation of different concepts for offshore foundations such as jackets and buckets
  • Involved in the design and dimensioning of the foundation for the C5 Prototype
  • Development, design and dimensioning of steel structure using 3D CAD Catia V5 and FEM tools such as Patran/Nastran and Catia FEA.
  • Site manager during construction of the C5 prototype in Gdansk, Poland. Doing project management, checking that the machine was build according to drawings and taking onsite decisions.
  • System testing in the drydock in Frederikshavn
  • Part of the core team who installed the C5 prototype in the North Sea in September 2009
Client
Wave Star Energy
Date
2007-2010
Services
R&D, Site Management